Hazardous Site Clearance in Basingstoke

In this case study, we delve into a successful hazardous site clearance project involving the safe and compliant removal of redundant oil tanks from a site in Basingstoke. The site clearance project centered around the meticulous removal of four partially laden kerosene tanks from a muddy field, ensuring their safe transport, decontamination, and recycling.

This case study demonstrates our commitment to environmental responsibility, compliance, and innovative solutions in hazardous site clearances resulting in the recovery of valuable metals and the prevention of waste oil leakage into the environment.

The Challenge

The tanks were located in a muddy field, posing challenges in terms of safe lifting and transportation without causing environmental damage during the site clearance.

Environmental Concerns

The presence of partially laden tanks containing kerosene raised concerns about potential environmental contamination, necessitating careful handling and decontamination.

Regulatory Compliance

Ensuring adherence to environmental regulations and safe handling practices throughout the project was paramount to avoid penalties and reputational damage.

Site Clearance Project Execution

Thorough planning involved evaluating the site conditions, devising a lifting strategy for the muddy field, and coordinating the sequence of actions to minimise environmental impact.

Safe Lifting and Sealing

We used a specialized HIAB to lift the partially laden kerosene tanks from the muddy field. The tanks were sealed and bunded to prevent spillage during transportation.

Decontamination

The tanks were transported to a cleaning contractor specializing in decontamination. The cleaning process removed any remaining kerosene, ensuring that the tanks were safe for recycling.

Recycling Preparation

After decontamination, the tanks were reloaded and transported to EMR, a reputable recycling company. The tanks were deconstructed and shredded to recover valuable metal materials.

Results

Metal Recovery

The deconstruction and recycling process at EMR yielded an impressive recovery of 7 tons of valuable metal from the redundant oil tanks.

Prevention of Environmental Contamination

Through diligent handling, decontamination, and recycling, 350 liters of waste oil were prevented from leaching into the environment.

Environmental Compliance

The entire project was executed in strict adherence to environmental regulations, ensuring that no harm was caused to the surroundings.

Site Clearance Conclusion

The Basingstoke oil tank removal case study exemplifies our commitment to environmental stewardship, innovation, and compliance. By addressing challenges head-on and employing strategic solutions, we achieved the environmentally responsible removal, decontamination, and recycling of redundant oil tanks.

We believe that this case study serves as an informative resource for individuals and businesses seeking insights into executing environmentally conscious projects while adhering to stringent regulations.